EV ChargingNovember 18, 202411 min read

Wire Sizing for EV Charging Stations

Complete guide to properly sizing wire for Level 2 EV charging stations, including NEC Article 625 requirements and installation best practices.

Introduction to EV Charging Wire Requirements

Electric vehicle charging stations require proper wire sizing to ensure safe, efficient operation and compliance with NEC Article 625. Unlike typical appliances, EV chargers operate as continuous loads, requiring special consideration in circuit design.

Understanding EV Charging Levels

Level 1 Charging (120V)

  • Voltage: 120V AC
  • Current: 12-16 amps
  • Charging Speed: 3-5 miles of range per hour
  • Wire Size: 14 AWG (15A) or 12 AWG (20A)

Level 2 Charging (240V) - Primary Focus

  • Voltage: 208-240V AC
  • Current: 16-80 amps (typically 32-48A)
  • Charging Speed: 12-60 miles of range per hour
  • Wire Size: Depends on amperage (see table below)

NEC Article 625 Requirements

Continuous Load Factor

EV charging is considered a continuous load (3+ hours). NEC requires:

Circuit Rating = Charger Amperage × 125%

Example: A 32A charger requires a 40A circuit (32 × 1.25 = 40A)

Dedicated Circuit Requirement

  • EV charger must be on a dedicated circuit
  • No other loads allowed on the circuit
  • GFCI protection required for certain installations
  • Disconnect means required within sight

Wire Size Selection Chart

Charger RatingRequired CircuitCopper WireAluminum WireBreaker Size
16A Charger20A12 AWG10 AWG20A
24A Charger30A10 AWG8 AWG30A
32A Charger40A8 AWG6 AWG40A
40A Charger50A6 AWG4 AWG50A
48A Charger60A6 AWG4 AWG60A
64A Charger80A4 AWG2 AWG80A

Step-by-Step Installation Planning

Step 1: Determine Charger Requirements

  • Maximum charging current (amps)
  • Input voltage requirement (208V or 240V)
  • Hardwired vs plug-in installation
  • Indoor or outdoor mounting

Step 2: Calculate Circuit Requirements

Example Calculation

  • Charger rating: 32 amps
  • Continuous load factor: 32A × 1.25 = 40A
  • Required circuit: 40A minimum
  • Wire size (copper): 8 AWG
  • Breaker size: 40A

Step 3: Measure Installation Distance

Measure from main panel to charging location. For runs over 50 feet, voltage drop becomes critical.

Step 4: Check Voltage Drop

Calculate voltage drop to ensure it stays under 3%. For 240V circuits, maximum acceptable drop is about 7 volts. Use our Voltage Drop Calculator for accurate calculations.

Common Installation Scenarios

Scenario 1: Garage Installation (Short Run)

  • Distance: 20-30 feet from panel
  • Charger: 32A Level 2
  • Solution: 8 AWG copper wire, 40A breaker
  • Conduit: 3/4" EMT or PVC

Scenario 2: Driveway Installation (Long Run)

  • Distance: 100 feet from panel
  • Charger: 32A Level 2
  • Solution: 6 AWG copper (upsized for voltage drop)
  • Conduit: Underground rated PVC

Installation Best Practices

Wire Type Selection

  • THWN-2: Suitable for wet and dry locations
  • Copper preferred: Better conductivity, easier terminations
  • Aluminum option: Cost savings on long runs, requires larger size

Future-Proofing

  • Install larger wire than currently needed
  • Consider 48-64A circuits even for 32A chargers
  • Run extra conduit for future additions
  • Document installation for future reference

Common Mistakes to Avoid

1. Undersizing the Circuit

Failing to apply the 125% continuous load factor results in code violations and potential overheating.

2. Ignoring Voltage Drop

Long runs without upsized wire lead to slow charging and reduced efficiency.

3. Using Extension Cords

Never use extension cords with EV chargers. Always install a dedicated circuit to the charging location.

Permit and Inspection Requirements

  • Electrical permit required in most jurisdictions
  • Licensed electrician often required
  • Final inspection mandatory
  • Documentation for insurance and home sale

Tools and Calculators

Use our suite of tools to plan your EV charging installation:

Conclusion

Proper wire sizing for EV charging stations is critical for safe, efficient, and code-compliant operation. By following NEC Article 625 requirements, applying the 125% continuous load factor, and accounting for voltage drop on long runs, you can ensure your EV charging installation will provide years of reliable service.

Always consult with a licensed electrician for installation, as EV charging circuits are typically beyond DIY scope and require professional expertise and permitting.

TOOLS

Calculate Your Wire Size

Use our professional calculators to determine the correct wire gauge, voltage drop, and ampacity for your electrical project.

Related Articles